Glossary: Difference between revisions
Appearance
Content deleted Content added
| Line 20: | Line 20: | ||
;ELF:Early Life Failure - A fault soon after an install |
;ELF:Early Life Failure - A fault soon after an install |
||
;CDTA:Conscious Decision To Appoint - force booking a Openreach engineer |
;CDTA:Conscious Decision To Appoint - force booking a Openreach engineer |
||
;FTR:Fault Threshold Rate - The speed at which the line is considered at fault |
|||
;DP:Distribution Point |
;DP:Distribution Point |
||
;KBD:Knowledge Based Diagnostics |
;KBD:Knowledge Based Diagnostics |
||