Glossary: Difference between revisions
Appearance
Content deleted Content added
m →BT Fault Terms: clean up, typos fixed: eg → e.g. (2), a Openreach → an Openreach |
|||
| Line 19: | Line 19: | ||
;CP:Communications Provider |
;CP:Communications Provider |
||
;ELF:Early Life Failure - A fault soon after an install |
;ELF:Early Life Failure - A fault soon after an install |
||
;CDTA:Conscious Decision To Appoint - force booking |
;CDTA:Conscious Decision To Appoint - force booking an Openreach engineer |
||
;FTR:Fault Threshold Rate - The speed at which the line is considered at fault |
;FTR:Fault Threshold Rate - The speed at which the line is considered at fault |
||
;DP:Distribution Point |
;DP:Distribution Point |
||
| Line 32: | Line 32: | ||
;AI:Action Item |
;AI:Action Item |
||
;WAC:Work Allocation Controls (team) |
;WAC:Work Allocation Controls (team) |
||
;PONR:Point of Now Return - |
;PONR:Point of Now Return - e.g. when an engineer is booked and cannot now be cancelled. |
||
;PCP:Primary Cross-connect Point |
;PCP:Primary Cross-connect Point |
||
;PEW:Planned Engineering Works |
;PEW:Planned Engineering Works |
||
| Line 42: | Line 42: | ||
;SIN:Supplier Information Note [BT] |
;SIN:Supplier Information Note [BT] |
||
;SMTP:Shared Metallic Path Facility |
;SMTP:Shared Metallic Path Facility |
||
;SP:Service Provider ( |
;SP:Service Provider (e.g. AAISP) |
||
;SSFP:Service Specific Front Plate |
;SSFP:Service Specific Front Plate |
||
;TPM:Tie Pair Modify - The cable from the MDF (main distribution frame) to the DSLAM port is replaced |
;TPM:Tie Pair Modify - The cable from the MDF (main distribution frame) to the DSLAM port is replaced |
||