Status Tests
These tests will show the sync status of the line and as well as some other details such as errors etc. They may also state if a fault has been identified.
BT ADSL Sync Status Test
Accessing This Feature
Access is via the Control Pages as follows:
- Log in to the Control Pages with your xxx@a login
- Click on the line you want to run the test on
- Click on the Status Test button
Availability
Available on BT ADSL lines. This will report back the current sync status of the line, including error counts. This is non-intrusive and should not cause the line to drop.
Example output:
BT Test xDSL Status Check:Pass Standalone sub test passed successfully. Pass OK. Circuit In Sync. BRAS=5779kbit/s FTR=6502kbit/s MSR=8128kbit/s ServOpt=1 I/L=A Up Sync=854kbit/s LoopLoss=22.6 dB SNR=17.5 dB ErrSec=0 HECErr=0 Cells=1677609 Down Sync=6551kbit/s LoopLoss=40.8 dB SNR=13.5 dB ErrSec=0 HECErr=N/A Cells=4001712
This shows the line is In Sync, with an Up Sync of 854Kb/s, and a Down Sync of 6551Kb/s.
BT Test xDSL Status Check:Pass OK.pass OK. Circuit In Sync BRAS=5000Kb/s FTR=6374Kb/s MSR=7968Kb/s ServOpt=1 I/L=A Up Sync=448Kb/s LoopLoss=21dB SNR=24dB HIGH ErrSec=0 HECErr=0 Cells=928584990 Down Sync=6144Kb/s FTB LoopLoss=33dB SNR=10dB ErrSec=0 HECErr=0 Cells=-1335203176
This one shows that the line has a FTB - Fault Threshold Breach - ie, the Down Sync (6,144) is less than the Fault Threshold Rate (6,374). The line speed is below what it should be and would need looking in to. See: Category:Slow_ADSL
BT FTTC End to End Test
Accessing This Feature
Access is via the Control Pages as follows:
- Log in to the Control Pages with your xxx@a login
- Click on the line you want to run the test on
- Click on the E2E Test button
Availability
Available on BT FTTC/FTTP lines.
This will run FTTC/FTTP specific tests and will suggest if it finds a fault or not.
Example result:
BT Test E2E Access Test/DCN:Inconclusive OR test pass. Unable to find the fault. Down:40.0 (39.7/39.9/40.0) Up:10.0 (9.9/9.9/9.9) NA 0.128M-40M Downstream, Interleaving Off - 0.128M-10M Upstream, Interleaving Off. In Sync Pass:GTC_FTTC_SERVICE_0000 GEA service test completed and no fault found.
If the test says...
Down:40.0 (//) Up:10.0 (//)
...then the line is probably not in sync (no sync figures given).